Welcome to the Infrastructure Engineering iLab platform. Infrastructure Engineering runs 6 laboratories: Structural, Concrete, Vasey, Geotech, Wet Lab and Sexton Ecohydraulics labs which support a variety of research and testing. An extensive range of advanced instrumentation is available with expert assistance provided by our professional team.
In the EEE (Electrical and Electronic Engineering) Fabrication laboratory, we have capabilities on wide ranges of thin-film depositions via both physical vapour depositions (thermal and e-beam) and chemical vapour depositions (ALD) in our PV labs, and laser and PCB fabrications.
Dr. Rackel San Nicolas
Dr. James Bullock
Infrastructure Engineering Lab | Location and hours of operation |
Structural Lab Concrete Lab Vasey Lab Geotech Lab Geopolymer Lab Wet Lab Sexton Ecohydraulics Lab |
B.01 / Building 176 Block D (9am - 5pm) B.04 / Building 176 Block D (9am - 5pm) G08 / Building 176 Block D (9am - 5pm) BG01 / Building 175 Block B (9am - 5pm) BG01 / Building 175 Block B (9am - 5pm) BM01 / Building 176 Block D (9am - 5pm) C324 / Building 174 Block C (9am - 5pm) |
Lab | Location and hours of operation |
PV lab. |
Rm. 115 B and C / Building 166 Old Metallurgy (9am - 5pm) |
Name | Role | Phone | Location | |
---|---|---|---|---|
Andrew Western |
Head of Infrastructure Engineering Department
|
61 3 8344 7305
|
a.western@unimelb.edu.au
|
|
Guillermo Narsilio |
Deputy Head of Infrastructure Engineering Department
|
61 3 8344 4659
|
narsilio@unimelb.edu.au
|
Level 2, Building 175, Block B 208
|
Rackel San Nicolas |
Francis Lab Manager
|
61 3 9035 3263
|
rackel.san@unimelb.edu.au
|
D418, Building 176, Block D, Parkville
|
Jinghan Lu |
Francis Lab Engineer
|
61 434617091
|
jinghanl@unimelb.edu.au
|
Level 1, Building 175, Block B 103
|
Mahdi Miri Disfani |
Geotech Lab Manager
|
61 3 83445972
|
mahdi.miri@unimelb.edu.au
|
Level 2, Building 175, Block B 207
|
Justin Macklin |
Geotech Lab Research Assistant
|
61 432624522
|
justin.macklin@unimelb.edu.au
|
Level 1, Building 176, Block D 159.01
|
Michael Stewardson |
Sexton Lab Manager
|
61 407809106
|
mjstew@unimelb.edu.au
|
333 Exhibition St 353.13
|
Rodger Young |
Sexton Lab Environmental Monitoring/ Vasey Lab Water Group
|
61 3 83447018
|
riy@unimelb.edu.au
|
Engineering Block D DG12
|
David Chan |
Lab Manager (Teaching)
|
61 3 83443361
|
kaic@unimelb.edu.au
|
Level 1, Building 176, Block D 156.02
|
Steve Adams |
SENIOR LABORATORY TECHNICIAN (WET LAB)
|
61 3 83446227
|
scadams@unimelb.edu.au
|
Level 1, Building 176, Block D 156.01
|
James Bullock |
Head of EEE PV labs
|
61 3 90357925
|
james.bullock@unimelb.edu.au
|
Level 5, Building 193 (Electrical & Electronic Engineering )
|
Ray Furmston |
Wet Lab Technical Officer
|
61 3 8344 6665
|
ray.furmston@unimelb.edu.au
|
Level 1, Building 176, Block D 159.02
|
Angus Webb |
Sexton Lab Manager
|
61 3 83449347
|
angus.webb@unimelb.edu.au
|
Level 4, Building 176, Block D, 405
|
Dongryeol Ryu |
Vasey Lab Manager
|
61 3 83447115
|
dryu@unimelb.edu.au
|
Melbourne Connect -700 Swanston St 6321
|
Laura Jukes |
Geopolymer Lab Research Assistant
|
61 3 83449572
|
laura.jukes@unimelb.edu.au
|
Ground, Building 167, Chemical Engineering 2, G02.03
|
Eric Schoof |
Senior Research Associate in Mechatronic Design
|
61 3 83443853
|
eschoof@unimelb.edu.au
|
Service list |
► Thin film depostion (1) | |||
Name | Description | Price | |
---|---|---|---|
Thin film deposition Per run |
This is used to charge the evaporation run only. The pumping process normally takes a long time to reach the certain pressure. In order to avoid the extra charges for pumping time. The cost for each run, within one hour, is used here. |
Internal
$20.00
each
External $0.00 each Corporate $100.00 each Special 1 $50.00 each Special 2 $0.00 each |
|
► Triaxial Testing (1) | |||
Name | Description | Price | |
GDS Triaxial Automated System (GDSTAS) - Training |
Submit a days training request for the GDTAS by one of the Geotechnical laboratory staff. |
Internal
$575.00
Day
|
|
► Soil Classification Tests (2) | |||
Name | Description | Price | |
Atterberg Limits Tests - Liquid Limit, Plastic Limit & Plasticity Index |
Determination of Atterberg limits and plasticity index. The laboratory follows the AS 1289.3.1.1, AS 1289.3.2.1 & AS 1289.3.3.1 standard methods, if you require different test standards please specify this in the request notes. |
Internal
$60.00
Sample
External $150.00 Sample |
|
Particle Size Distribution - Sieve Analysis |
Particle size distribution of coarse-grained soil (>75um). The laboratory follows the AS 1289.3.6.1 standard method, if you require a different test standard please specify this in the request notes. |
Internal
$60.00
each
External $150.00 each |
|
► Soil Compaction & Density Tests (1) | |||
Name | Description | Price | |
Determination of Dry Density/Moisture Content - Modified Compactive Effort |
Modified effort soil compaction test. The laboratory follows the AS 1289.5.2.1 standard method, if you require a different test standard please specify this in the request notes. |
Internal
$60.00
Sample
External $150.00 Sample |
|
► Soil Strength & Consolidation Tests (1) | |||
Name | Description | Price | |
Consolidated Undrained (CU) Triaxial Compression Test - With Pore Pressure Measurement |
Consolidated undrained triaxial shear testing. The laboratory follows the AS 1289.6.4.1 standard method, if you require a different test standard please specify this in the request notes. |
Internal
$600.00
Sample
External $1,500.00 Sample |